How Concrete & Yard Works

Professional material takeoffs and logistics math in 3 simple steps.

1Select & Input

Pick your exact project (slab, footing, wall, gravel, dirt, or pavers) and input dimensions in feet and inches.

2Density & Buffer

Select aggregate density and set the recommended 10% contractor waste buffer to prevent short-pour penalties.

3Takeoff & Print

Instantly view exact cubic yards, retail bag counts, tonnage, and 1-click copy or print contractor PDF sheets.

Keyboard Shortcuts:
Esc CloseTab Next FieldCtrl/⌘+P Print

Footing Calculator

Instant Sonotube tube volume, post hole concrete yardage, and pre-mix bag requirements.

0.60 ft³ per 80lb bag
3. Enter DimensionsFeet & inches auto-calculated
ft
in
ft
in
inches
Visual Dimension Guide20'0" L × 10'0" W × 4" T
L: 20 ft 0 inW: 10 ft 0 inT: 4 in
+Advanced Waste Buffer & Multi-Zone Takeoff
10% Waste Buffer · 1 Zone
Subgrade deflection & spillage allowance
units
Project Zones:

Zone Breakdown Summary

1 Zone
Zone NameGeometryDimensionsCu FtCu Yds

Cylinder Volume Math: Sonotubes, Piers & Post Holes

Accurately sizing round post holes prevents expensive short-load fees and mid-pour supply runs.

Geometric Cylinder Formula

Volume of a Round Concrete Column

The volume of a cylinder is calculated by multiplying base circle area by total hole depth. Because diameter is measured in inches while depth is measured in feet:

Volume (cu ft) = π × (Diameter in ÷ 24)² × Depth ft × Quantity

To convert cubic feet to cubic yards: divide total cubic feet by 27.

Pre-Mix Bag Yield Factors

Bags Required per Footing

Pre-packaged dry concrete expands slightly upon mixing with water. Yield benchmarks established by ASTM C387:

80 lb Bags = (cu ft ÷ 0.60) × 1.10 60 lb Bags = (cu ft ÷ 0.45) × 1.10 50 lb Fast-Setting = (cu ft ÷ 0.375) × 1.10

1.10 multiplier incorporates standard 10% spillage and jagged soil loss buffer.

Sonotube Size Chart & Yield Specifications

Standard cardboard form tubes, linear foot yields, and structural applications.

Tube DiameterCu Ft per Foot of Depth3 ft Depth (80 lb Bags)4 ft Depth (80 lb Bags)10 Tubes @ 4 ft (yd³)Recommended Structural Use
8-Inch (200 mm)0.349 cu ft2 bags3 bags0.52 yd³Fence posts, mailbox posts, small 4x4 deck corners
10-Inch (250 mm)0.545 cu ft3 bags4 bags0.81 yd³Standard single-story deck piers (6x6 posts), pergolas
12-Inch (300 mm)0.785 cu ft4 bags6 bags1.16 yd³Two-story deck posts, hot tub supports, light pole bases
16-Inch (400 mm)1.396 cu ft7 bags10 bags2.07 yd³Heavy timber structures, pole barns, commercial signs
24-Inch (600 mm)3.142 cu ft16 bags22 bags4.65 yd³Massive foundation caissons, structural grade beams

Frost Depth & Building Code (IRC R403) Rules

Why footings must penetrate below the frozen soil horizon to prevent catastrophic frost heaving.

Frost Heave Mechanics

When moist soil freezes, ice lenses expand upward with thousands of pounds of hydraulic pressure. If a footing bottom sits inside the freezing zone, ice pushes the pier up in winter and causes uneven settlement when thawing in spring.

Regional Frost Lines

- Southern US (FL, TX, GA): 12" minimum code depth
- Mid-Atlantic (VA, NC, MD): 24" to 30" depth
- Midwest / Northeast (IL, NY, PA): 36" to 42" depth
- Northern Zones (MN, WI, ME, Canada): 48" to 60" depth

Bell Footings & Bigfoot Forms

To prevent uplift friction and spread point loads over weak soil (e.g. 1500 psf clay), attach a flared plastic bell base (Bigfoot Form) to the bottom of the tube. This doubles bearing surface without digging a massive trench.

Pre-Calculated Post Hole Takeoff Matrix

Quick concrete requirements for common project post counts (includes 10% contractor spillage buffer).

Number of Holes8" Dia × 36" Depth10" Dia × 36" Depth10" Dia × 48" Depth12" Dia × 48" DepthDelivery Recommendation
4 Holes (Small Pergola)8 bags (80 lb)12 bags (80 lb)16 bags (80 lb)23 bags (80 lb)Hand-mix bags in wheelbarrow
8 Holes (Deck Piers)16 bags (80 lb)24 bags (80 lb)32 bags (80 lb)46 bags (80 lb)Rent towable drum mixer
12 Holes (Large Deck)23 bags (80 lb)36 bags (80 lb)48 bags (80 lb)69 bags (1.5 yd³)Towable mixer or short truck load
20 Holes (Full Fence Line)39 bags (80 lb)60 bags (80 lb)80 bags (1.8 yd³)115 bags (2.6 yd³)Ready-mix truck delivery strongly recommended

Frequently Asked Questions

How many bags of concrete do I need for a 10-inch Sonotube?
A 10-inch diameter cylindrical tube contains approximately 0.545 cubic feet of volume per linear foot. For a standard 4-foot deep footing (2.18 cu ft total volume), you will need approximately 4 bags of 80 lb concrete (or 5 bags of 60 lb concrete) including a 10% spillage buffer.
How deep does a deck footing need to be?
Under International Residential Code (IRC Section R403.1.4), exterior footings must extend at least 12 inches below undisturbed soil and at least 6 to 12 inches below the local frost depth to prevent frost heave. In warm southern states, depth is typically 12 to 18 inches; across the Midwest and Northeast, frost depths range from 36 to 48 inches.
What is the cylinder volume formula for concrete footings?
The volume formula is: Volume (cu ft) = π × (Diameter in ÷ 24)² × Depth ft. To convert to cubic yards, divide the resulting cubic feet by 27. To calculate 80 lb bags, divide cubic feet by 0.60 cu ft per bag.
Should I use Fast-Setting concrete for post footings?
Fast-Setting concrete (such as Quikrete Red Bag 50 lb) is ideal for non-structural fence posts and mailboxes because it sets within 20 to 40 minutes without mechanical bracing. However, for structural deck piers carrying substantial load, standard 4000 PSI high-strength concrete is recommended by building inspectors.
Why do post holes always require more concrete than calculated?
Augers and post-hole diggers rarely cut perfectly smooth vertical cylinders. Soil collapses, root obstructions, and bell-shaped bottoms create jagged cavities that expand hole volume by 10% to 20%. Always order at least 10% to 15% extra bags to avoid running short midway through a pour.