Skip to main content

How Concrete & Yard Works

Professional material takeoffs and logistics math in 3 simple steps.

1Select & Input

Pick your exact project (slab, footing, wall, gravel, dirt, or pavers) and input dimensions in feet and inches.

2Density & Buffer

Select aggregate density and set the recommended 10% contractor waste buffer to prevent short-pour penalties.

3Takeoff & Print

Instantly view exact cubic yards, retail bag counts, tonnage, and 1-click copy or print contractor PDF sheets.

Keyboard Shortcuts:
Esc CloseTab Next FieldCtrl/⌘+P Print
Civil Engineering & Masonry Standard

Cubic Yard Conversion Guide

A cubic yard (yd³) is the universal volume unit for bulk building and landscaping materials across North America—including ready-mix concrete, gravel, fill dirt, mulch, and sand. Master the underlying geometry, mathematical conversion formulas, and weight correlations below.

Core Principle: Why We Divide by 27

One linear yard equals exactly 3 linear feet. When expanded into three-dimensional volume, a cubic yard measures 3 feet long by 3 feet wide by 3 feet tall: 3 ft × 3 ft × 3 ft = 27 cubic feet. Therefore, whenever job dimensions are calculated in cubic feet, you must always divide by 27 to convert to cubic yards.

Primary Formulas by Geometric Shape

Because structural plans and landscape stakes specify horizontal lengths in feet while depth or thickness is measured in inches, field formulas require unit synchronization before volume calculations.

1. Rectangular Slabs & Footings

L × W × H

For patios, garage floors, walkways, driveways, garden beds, and foundation grade beams:

Volume (yd³) = (Length in ft × Width in ft × (Thickness in inches ÷ 12)) ÷ 27

Worked Example: A slab 20 ft long by 15 ft wide at 4 inches thick:
20 × 15 × (4 ÷ 12) = 300 × 0.3333 = 100 ft³
100 ft³ ÷ 27 = 3.70 cubic yards.

2. Cylinders, Sonotubes & Post Holes

π × r² × H

For deck footings, round columns, drilled caissons, and fence post holes:

Volume (yd³) = [π × (Diameter in ft ÷ 2)² × Depth in ft] ÷ 27

Worked Example: A 12-inch diameter Sonotube (1.0 ft) drilled 4 feet deep:
Radius = 0.5 ft. Area = 3.14159 × (0.5)² = 0.7854 sq ft.
Volume = 0.7854 × 4 ft = 3.14 ft³ ÷ 27 = 0.116 yd³ per post hole.

Quick Reference Conversion Cheatsheet

Cross-reference cubic yards against cubic feet, cubic inches, metric cubic meters, 80-lb pre-mix concrete bags, and standard crushed gravel tonnage.

Cubic Yards (yd³)Cubic Feet (ft³)Cubic Inches (in³)Cubic Meters (m³)80 lb Concrete BagsGravel Est. Weight
0.25 yd³6.75 ft³11,664 in³0.19 m³12 bags0.35 tons
0.50 yd³13.50 ft³23,328 in³0.38 m³23 bags0.70 tons
0.75 yd³20.25 ft³34,992 in³0.57 m³34 bags1.05 tons
1.00 yd³27.00 ft³46,656 in³0.76 m³45 bags1.40 tons
1.50 yd³40.50 ft³69,984 in³1.15 m³68 bags2.10 tons
2.00 yd³54.00 ft³93,312 in³1.53 m³90 bags2.80 tons
3.00 yd³81.00 ft³139,968 in³2.29 m³135 bags4.20 tons
4.00 yd³108.00 ft³186,624 in³3.06 m³180 bags5.60 tons
5.00 yd³135.00 ft³233,280 in³3.82 m³225 bags7.00 tons
10.00 yd³270.00 ft³466,560 in³7.65 m³450 bags14.00 tons

Material Weight Equivalents (Pounds & Tons per Cubic Yard)

Volume alone does not dictate hauling capacity. You must account for material density when loading pickup trucks or ordering dump trucks:

Solid Concrete
~4,000 lbs
2.0 Tons / yd³

Standard wet mix density is 145 to 150 lbs/ft³.

Crushed Stone / Gravel
~2,800 lbs
1.4 Tons / yd³

DGA and #57 stone density averages ~100-105 lbs/ft³.

Screened Topsoil
~2,000–2,200 lbs
1.0–1.1 Tons / yd³

Dry loose soil is ~75 lbs/ft³; damp soil reaches 90 lbs/ft³.

Wood Bark Mulch
~800–1,000 lbs
0.4–0.5 Tons / yd³

One pickup truck bed easily carries 2 to 2.5 yards of dry mulch.

Frequently Asked Questions

How many cubic feet are in a cubic yard?
There are exactly 27 cubic feet in one cubic yard. This is derived from 3 feet × 3 feet × 3 feet = 27 ft³.
What is the formula to convert square feet and inches to cubic yards?
To convert square feet with a thickness in inches to cubic yards: Multiply Square Footage × (Thickness in Inches ÷ 12) ÷ 27. For example, a 300 sq ft patio at 4 inches thick: 300 × (4 ÷ 12) ÷ 27 = 3.70 cubic yards.
How do you convert cubic meters to cubic yards?
Multiply cubic meters (m³) by 1.30795 to get cubic yards (yd³). Conversely, multiply cubic yards by 0.764555 to get cubic meters.
How many tons are in a cubic yard of gravel or dirt?
One cubic yard of crushed stone gravel weighs approximately 1.4 tons (2,800 lbs). One cubic yard of fill dirt or topsoil weighs between 1.0 to 1.25 tons (2,000 to 2,500 lbs) depending on moisture and compaction.
How many bags of concrete make one cubic yard?
It requires 45 bags of 80 lb concrete, 60 bags of 60 lb concrete, or 72 bags of 50 lb concrete to produce 1 cubic yard (27 ft³) of solid concrete.